Steel Soldiers now has a few new forums, read more about it at: New Munitions Forums!
Microsoft MSN, Live, Hotmail, Outlook email users may not be receiving emails. We are working to resolve this issue. Please add support@steelsoldiers.com to your trusted contacts.
One can hope, my MEP-016D Yanmar conversion had a real creative mess in the control box. It "worked" or at least seemed to when I bought it which is strange enough, the hour meter read 0.4 hours, it turned out to be a 24VDC hour meter connected to the 120VAC line output tapped off one of the...
ETN550, thanks for clearing up the details, you work with these more than I do, although it should probably be strongly noted that some units may be wired differently. For example my MEP-701a came with the ground jumper on L2 and has no ground modification labelling, panel outlet was also wired...
It may also help to visualize the meter as connected to the tie points that would become L2 and L3 if the voltage reconnection switch were set to the appropriate 3 phase voltage.
Ike
p.s. on the continuity issue, you would have the resistance of the windings when the generator is off, I don't...
Internally this is a 12 lead generator, the voltage reconnection switch just connects these leads in various combinations for your selected voltage. There are 2 possible connection combinations that can supply 120/240V single phase, those being double delta and low zig-zag, I think the MEP-701a...