My M817 like many has seen mostly short run dump duty in its lifetime. The linkages for dumping/engaging the PTO are pretty well clapped out. Mostly on the PTO side probably by trying to jam it in with the transmission input shaft still spinning.
So I could pull everything apart and build new linkages... or I'm thinking about just fabricating a dual acting air cylinder.
A small bracket, dual acting cylinder, a PTO switch and some air lines I think will work. Has anyone done this before? It seems way easier then the whole linkage set up currently on the truck.