Okay, still working on this project, just been busy. REALLY cold out tonight, was 8 degrees when I was working on it.
I did modify one crossmember slightly, just cut and bent the edge of one down some, and welded.
Got the pto, pto driveshaft, and hydrualic pump installed. Was going to install the tank and pump in the very back, but running the driveshaft was going to be a real pain. Wanted to keep the spare tire and air tanks in the orginal location, so to say the least, I didn't have much space left.
The tank has the pump inside of it. I put it next to the air tanks, inbetween the frame rails. Needed to chain drive off the pto driveshaft. The driveshaft has very tight clearences, had to grind the corners off the 7/8 square driveshaft to clear some bolts and braces. Also cut the ends off some bolts flush with the nuts.
Made up a frame to fit around the tank, and used allthread to adjust it up and down for chain tension.
Had to get the right size yoke for PTO end of the driveshaft. Had to shorten the driveshaft some.
The tank barely fits under the bed, when the bed is down, it will fit inbetween the bed framerails, up into the bed crossmembers.
Still have to install hoses, cable for valve, shifter for pto, and taillights.
Very tight between the pto shaft and the spare tire, I may have to move the spare out a inch or 2. Modified the 4 bolt pillow bearing into a 3 bolt for a little more clearance.