Hello Gents
I am looking at buying a very nice MEP005 genset it is 30KW 60 hours on the unit the gentelmen also has a nicer 15kw unit with 2 hours on the clock my question is price is about the same for each I want it for emergency power at my house as well as run some jobsite lighting elect jack hammers ect. and I have a 480 3 phase mill that I would like to run ( so I don't have to buy a Phase converter) and the wiring can be set up in either one to run 110 220 single phase or move the wires for 480 3 phase.
I am wondering if the 30KW is a little to big and I should go with the 15KW as it is my understanding these units like to run at about 80% load or you can wet stack the motor.
any advise or comments welcome.
Thanks Jerry
I am looking at buying a very nice MEP005 genset it is 30KW 60 hours on the unit the gentelmen also has a nicer 15kw unit with 2 hours on the clock my question is price is about the same for each I want it for emergency power at my house as well as run some jobsite lighting elect jack hammers ect. and I have a 480 3 phase mill that I would like to run ( so I don't have to buy a Phase converter) and the wiring can be set up in either one to run 110 220 single phase or move the wires for 480 3 phase.
I am wondering if the 30KW is a little to big and I should go with the 15KW as it is my understanding these units like to run at about 80% load or you can wet stack the motor.
any advise or comments welcome.
Thanks Jerry