Ladies and Gentlemen!
Here we go again! This time its a M151-A-2
We are going to do a (MOTOR POOL ) resto on this project!
This means,
New wiring harness
New wheel bearings
new brakes
Check all universal joints ,clean and inspect and replace as necessary!
Check all rubber bushings at suspension points(replace as needed)
Body,
HAMMER OUT most defects, To be considered road worthy(minor dings and dents) will be passed over!
All electrical components will be made functional
WE have new steering linkage here so that will be installed!
Rebuilt knuckles front and back(in stock)
Gas tank check ,
structural inspection to body components(unibody spars and main frame)
Under body repair kit installed in necessary.
Tomorrow I will start posting pics!
I'm going to go into more detail with this build!
Total time on this one (part time) 3 months!
Here we go again! This time its a M151-A-2
We are going to do a (MOTOR POOL ) resto on this project!
This means,
New wiring harness
New wheel bearings
new brakes
Check all universal joints ,clean and inspect and replace as necessary!
Check all rubber bushings at suspension points(replace as needed)
Body,
HAMMER OUT most defects, To be considered road worthy(minor dings and dents) will be passed over!
All electrical components will be made functional
WE have new steering linkage here so that will be installed!
Rebuilt knuckles front and back(in stock)
Gas tank check ,
structural inspection to body components(unibody spars and main frame)
Under body repair kit installed in necessary.
Tomorrow I will start posting pics!
I'm going to go into more detail with this build!
Total time on this one (part time) 3 months!