I'm suppose to be working on my M796+Shelter Live-in, but I'm not!
This 146 has been taking my time, so I thought I should prob post up some pictures of it.
First off I needed a deck for it (we don't have enough ladders and they're a pain when your working in it) So I designed this as a no-waste job. Everything was measured to come out of standard sized lumber w/o having small pieces of off-cuts.
![13-06-26 (6).jpg 13-06-26 (6).jpg](https://www.steelsoldiers.com/data/attachments/337/337194-ebf48f9484a055b2f0f158b214da1076.jpg)
Next we stripped the floor and oiled it w/ a high quality oil (pure tung oil w/o any petro-chems)
Don't bother to tell me that we should have started w/ the ceiling and worked our way down, . . . I know. But we were doing it as we had funds and time. That's just how they happened.
![13-06-26 (12).jpg 13-06-26 (12).jpg](https://www.steelsoldiers.com/data/attachments/337/337195-fcae9fc2ec27eb46f843c350d60e94cd.jpg)
Then we ripped out the ceiling, upper ¼ round moldings, and removed the ac wiring w/ all switches. I'm only going to put 4 of the dome lights back in and 1 light switch by the side door.
Also smoothed out the walls a bit.
![14-04-09 (4).jpg 14-04-09 (4).jpg](https://www.steelsoldiers.com/data/attachments/337/337198-999d584d1b4f8d1afdfa60cfe815bed3.jpg)
This is where projects start to go the other direction, and the space begins to transform![Smile :) :)](data:image/gif;base64,R0lGODlhAQABAIAAAAAAAP///yH5BAEAAAAALAAAAAABAAEAAAIBRAA7)
This 146 has been taking my time, so I thought I should prob post up some pictures of it.
First off I needed a deck for it (we don't have enough ladders and they're a pain when your working in it) So I designed this as a no-waste job. Everything was measured to come out of standard sized lumber w/o having small pieces of off-cuts.
![13-06-26 (6).jpg 13-06-26 (6).jpg](https://www.steelsoldiers.com/data/attachments/337/337194-ebf48f9484a055b2f0f158b214da1076.jpg)
Next we stripped the floor and oiled it w/ a high quality oil (pure tung oil w/o any petro-chems)
Don't bother to tell me that we should have started w/ the ceiling and worked our way down, . . . I know. But we were doing it as we had funds and time. That's just how they happened.
![13-06-26 (9).jpg 13-06-26 (9).jpg](https://www.steelsoldiers.com/data/attachments/337/337193-2933f26060d0b3c78bd90986cb82fd75.jpg)
![13-06-26 (12).jpg 13-06-26 (12).jpg](https://www.steelsoldiers.com/data/attachments/337/337195-fcae9fc2ec27eb46f843c350d60e94cd.jpg)
Then we ripped out the ceiling, upper ¼ round moldings, and removed the ac wiring w/ all switches. I'm only going to put 4 of the dome lights back in and 1 light switch by the side door.
Also smoothed out the walls a bit.
![14-04-09 (1).jpg 14-04-09 (1).jpg](https://www.steelsoldiers.com/data/attachments/337/337196-5795adaaa92a0990b4e869329ea118d0.jpg)
![14-04-09 (3).jpg 14-04-09 (3).jpg](https://www.steelsoldiers.com/data/attachments/337/337197-a27841defcd0c30cc32f61b928b33c94.jpg)
![14-04-09 (4).jpg 14-04-09 (4).jpg](https://www.steelsoldiers.com/data/attachments/337/337198-999d584d1b4f8d1afdfa60cfe815bed3.jpg)
This is where projects start to go the other direction, and the space begins to transform