- 737
- 14
- 18
- Location
- Bothell, WA
Put a wet kit and winch on a M923, and after the PTO install things seemed to go pretty well.
But before I fire it up and re-wind the cable on the winch...
I looked in the TM, and can't find out if there's a procedure for bleeding all the air out of the hydraulic lines. Seems to simple to just engage the PTO and go. I missing something?
But before I fire it up and re-wind the cable on the winch...
I looked in the TM, and can't find out if there's a procedure for bleeding all the air out of the hydraulic lines. Seems to simple to just engage the PTO and go. I missing something?