mangus580
New member
- 6,010
- 282
- 0
- Location
- Western NY
I spent this weekend getting hte deuce ready for the trip to Aberdeen. Among the things done....
-Flushed Cooling System
-Pressure washed about 20 years of slime off the engine
-Added the 3rd battery to the box for my 12v system
-Evicted a family of mice from the air cleaner
-Fixed (and broke) the fuel pump... Think I might need a new one
-Removed the passenger side step to straigten from a previous oops
-Installed remaining LED Composites
-Added 2 bows to the cab canvas, and replaced original 3
-Vacuumed (yes vaccumed) the cab out. Had lots of chipped wood from a wood chipping project, and some silage from a different hauling project... was a mess
All in all, I got a lot done... but I got a lot more to go...
A couple pics attached. I think I was putting terminals on the 12v battery in the pics.
-Flushed Cooling System
-Pressure washed about 20 years of slime off the engine
-Added the 3rd battery to the box for my 12v system
-Evicted a family of mice from the air cleaner
-Fixed (and broke) the fuel pump... Think I might need a new one
-Removed the passenger side step to straigten from a previous oops
-Installed remaining LED Composites
-Added 2 bows to the cab canvas, and replaced original 3
-Vacuumed (yes vaccumed) the cab out. Had lots of chipped wood from a wood chipping project, and some silage from a different hauling project... was a mess
All in all, I got a lot done... but I got a lot more to go...
A couple pics attached. I think I was putting terminals on the 12v battery in the pics.
Attachments
-
81.7 KB Views: 260
-
47.2 KB Views: 261