• Steel Soldiers now has a few new forums, read more about it at: New Munitions Forums!

  • Microsoft MSN, Live, Hotmail, Outlook email users may not be receiving emails. We are working to resolve this issue. Please add support@steelsoldiers.com to your trusted contacts.

Fatigue cracks

bigmike

Well-known member
Steel Soldiers Supporter
2,005
355
83
Location
Dixon CA.
If it was me, I’d bevel the cracks then weld them and grind flush. Then I’d add a stiffener plate, larger then the stress area, under each hole and weld them in place.
 

73m819

Rock = older than dirt , GA. MAFIA , Dirty
Steel Soldiers Supporter
In Memorial
12,195
325
0
Location
gainesville, ga.
I would say, pull it all back together, weld it (total weld), clean up the weld, weld a 3x3x3/8 angle as long as you can fit on the inside, redrill the holes, this should hold longer then the truck. BEFORE installing the angle, PRIME EVERYTHING using a epoxy primer if possible, this will keep rust from building up between the angle and mount, also keeping the weld area from rusting.
 
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website like our supporting vendors. Their ads help keep Steel Soldiers going. Please consider disabling your ad blockers for the site. Thanks!

I've Disabled AdBlock
No Thanks