rustystud
Well-known member
- 9,280
- 2,988
- 113
- Location
- Woodinville, Washington
I've been working on a Fording project for my deuce since summer ended. I already have all the differentials and transfer-case and transmission connected with a 1/4" DOT hoses up to the engine firewall. Now I'm installing the heart of the project the control unit. It has a 0 to 3 PSI gauge, low pressure adjuster, switch and flow control valve. The last part I need is still in the mail. It's a 2-way 24 volt DC normally open solenoid valve that will control the air-flow to the collection unit where all the hoses met up. This will allow me to either vent normally the gear units or close it off and fill the units with 2.5 PSI of air pressure. This is enough air pressure to keep out water to a level of about 10ft deep. Since I never plan on going under water it will work just fine. This unit will mount under the main dash board. To operate all I need to do is flip the switch on and adjust the pressure regulator to 2.5 PSI .
The clutch housing has been sealed off. I have drilled and taped a 1/8" NPT hole for a DOT fitting on the upper housing. This now vents out with the rest of the hoses. I'll take more pictures when I get the unit installed.