- 4,810
- 742
- 113
- Location
- Liberty Hill, SC
Well, many of you know that I work for the Air Force driving trains. I also volunteer at a RR museum, as the mechanic/engineer/secretary/trackworker etc etc
We (the museum) recently got 1.5 miles worth of 119lb per yard rail and concrete crossties.
Problem was we needed all of this stuff moved. We calculated it would take 62 loads. The material was at a nuclear power station 15 miles from our railyard. I had just picked up Westech's M818 and he offered to sell it to me because he had found a m151.
So the stars aligned and I bought Westy's truck and leased a trailer and started moving.
Many have been asking for pictures so here they are! I didn't get any of the trailer when it was loaded with the crossties.
My wife Angie rode with me quite a bit and helped load and was a dang good spotter.
We (the museum) recently got 1.5 miles worth of 119lb per yard rail and concrete crossties.
Problem was we needed all of this stuff moved. We calculated it would take 62 loads. The material was at a nuclear power station 15 miles from our railyard. I had just picked up Westech's M818 and he offered to sell it to me because he had found a m151.
So the stars aligned and I bought Westy's truck and leased a trailer and started moving.
Many have been asking for pictures so here they are! I didn't get any of the trailer when it was loaded with the crossties.
My wife Angie rode with me quite a bit and helped load and was a dang good spotter.
Attachments
-
92.8 KB Views: 350
-
99.1 KB Views: 369
-
102.1 KB Views: 370
-
98.6 KB Views: 343
-
69.8 KB Views: 329
-
76.1 KB Views: 327
-
62.6 KB Views: 340
-
94.5 KB Views: 368
Last edited: