• Steel Soldiers now has a few new forums, read more about it at: New Munitions Forums!

  • Microsoft MSN, Live, Hotmail, Outlook email users may not be receiving emails. We are working to resolve this issue. Please add support@steelsoldiers.com to your trusted contacts.

Mep-002A Bridge rectifier R1 burnt

Guyfang

Moderator
Staff member
Moderator
16,924
24,545
113
Location
Burgkunstadt, Germany
Section III. OPERATIONAL TESTS
9-5. GENERATOR AND GENERATOR CONTROL CIRCUITRY.
Test per table 9-1.
NOTE
Resistor R3 (20, figure 6-10) in the output
control box, must be adjusted as follows before
performing any tests:
a. Remove wire D26F16 from TB3- 1 and connect 0
to 1 amp ac test ammeter as shown in figure 9-1.
b. Place output control switch in 120 position.
c. With the generator operating at rated speed
(1800 RPM) the generator field can be flashed by
placing the master switch on the control box in the
start position.
d. Close the circuit interrupter and apply rated
load.
e. Adjust R3 until ammeter previously installed
reads 0.6 amps. Tighten locknut on R3. R3 is now adjusted
properly.
f. Disconnect test equipment and proceed with testing
in accordance with test schedule table 9-1.

It was recommended that we do this if we changed the AC output box.
 
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website like our supporting vendors. Their ads help keep Steel Soldiers going. Please consider disabling your ad blockers for the site. Thanks!

I've Disabled AdBlock
No Thanks