Small Prepper
Member
- 57
- 2
- 8
- Location
- Gernantown, MD
Morning ALL
Just about finished mine. This is what I have left to do: Clamp down "fake" heat sheild. (just for looks) Mount bracket and run brake lines up the snorkel. Then tie them into blue lines that run to the Trans, Transfer Case and front and rear axle. Also planning on installing a pelican box over the fuse box, cutting out the back and sealing it. Notplanning on forging through water, just think it looks COOL.
Just about finished mine. This is what I have left to do: Clamp down "fake" heat sheild. (just for looks) Mount bracket and run brake lines up the snorkel. Then tie them into blue lines that run to the Trans, Transfer Case and front and rear axle. Also planning on installing a pelican box over the fuse box, cutting out the back and sealing it. Notplanning on forging through water, just think it looks COOL.