• Steel Soldiers now has a few new forums, read more about it at: New Munitions Forums!

  • Microsoft MSN, Live, Hotmail, Outlook email users may not be receiving emails. We are working to resolve this issue. Please add support@steelsoldiers.com to your trusted contacts.

Operation Urgent Restoration II The M715

m38inmaine

Well-known member
Steel Soldiers Supporter
2,118
67
48
Location
Maine USA
I have 6 solar panels, a 24 battery 24v battery bank, 3600 watt inverter/charger and 8Kw Isuzu diesel generator that auto starts/stops when needed, purchased a "service truck" air compressor that is engine driven, that took care of my high demand air needs. Propane appliances, direct vent oil boiler for heat/hot water all has been working well for many years.

Look forward to seeing the M715 project pictures.
 

Jericho

Well-known member
1,180
69
48
Location
Landaff NH
almost the same here, 6 340 watt panels, 7kw air rotor, two main gensets, John deere 33 kw turbo diesel tier 4 4 cylinder and a Mitsibishi tier 3 4 cylinder 24 Kw non turbo on an A/B circuit 3300 amp hours in L-16 trojan deep cycle 6 volt batteries and twin paired Trace 3600 watt 24/36 inverters have 24 years on the inverters, Just replaced the battery bank , had 8 years on it . Usually get 8 to 10 years from a bank . Mitsu has 110 thousand hours on it all ive changed is a water pump and altenator volltage regulator, John Deere is a nice unit but parts are expensive Fuel control solenoid went at 820 hours costing 850$ Been off grid since 1998, septic, artesian well and my own 3 mile phone line lol Not a prepper, power company wanted 188 thousand dollars to run power in !
 
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website like our supporting vendors. Their ads help keep Steel Soldiers going. Please consider disabling your ad blockers for the site. Thanks!

I've Disabled AdBlock
No Thanks