ichudov
Member
- 399
- 15
- 18
- Location
- Chicagoland, IL
I may need to transport two M923's from Sparta to Chicago. I have a regular flatbed semi trailer and we just may squeeze two of them on it with some creative placement (45ft trailer).
To be of legal height, we may need to reduce their height to the "minimum reducible height" by removing the soft tops, and exhaust and intake stacks.
My question is how time consuming is that?
thanks
To be of legal height, we may need to reduce their height to the "minimum reducible height" by removing the soft tops, and exhaust and intake stacks.
My question is how time consuming is that?
thanks