first cut...
Here are some pics of the first cut. I need to pass a BIG thank you to Gerald, George, Skipper, Eric and Franz. Each brought a special talent to the table.
We had a great weekend. The measurements were double checked and the cutting began. Started first cut at 2:15p and had two pieces at 6:45p. We spent today working to make several jigs and fixtures. The two pieces are ready for integration.
Next work day is Friday.
We will test fit the rubber tracks with only one 3" segment removed. If they fit then we will not make the second cut. Hopefully they will fall into the range of the track tensioner with only one 3" segment removed.