SCSG-G4
PSVB 3003
- 5,379
- 3,413
- 113
- Location
- Lexington, South Carolina
If the top is there, but it's no longer attached at the front > Pop rivets - a whole bunch of the 1/8 diameter long aluminum ones, along with aluminum washers. About one every two inches all the way across the front. Helps to have a small drill and some locking grip pliers to hold things while you are working. Start in the middle and work your way out to the sides. And, if you don't have the black plastic insert, stop by Lowes or Home Depot and get a 12' piece of bottom siding channel and clip it to length. Takes a couple of hours to do in the cold.