profo
Active member
- 428
- 74
- 28
- Location
- jeanerette,la
Started on Camper part 2 decided on crawl through not enough room for walk through Cab version and relocating spare/aircleaner assembly going well got about a week into it so far, will post as I go!
Will be lil brother of M927 5 ton Camper for son to have when we go camping! High speed gears are in , transmission fixed, And I am impressed with the acceleration, this things goes, so far I have moved things around and Intake tubing came out better than expected passes directly behind engine giving a lot of room to enter cab , will have to use a m900 series air filter canister and place it in front of battery box along frame rails and spare will be mounted on camper section on a winch rail system. Adding 2 feet to rear frame and extending hitch and also a 2" receiver hitch area for common hitch stuff. After calculating weights of material been used I will be at 4200 lbs with appliances so may have to add air bags.
Will be lil brother of M927 5 ton Camper for son to have when we go camping! High speed gears are in , transmission fixed, And I am impressed with the acceleration, this things goes, so far I have moved things around and Intake tubing came out better than expected passes directly behind engine giving a lot of room to enter cab , will have to use a m900 series air filter canister and place it in front of battery box along frame rails and spare will be mounted on camper section on a winch rail system. Adding 2 feet to rear frame and extending hitch and also a 2" receiver hitch area for common hitch stuff. After calculating weights of material been used I will be at 4200 lbs with appliances so may have to add air bags.