Looking at trying to simplify my 002s. I only use them in single phase 240v setting. I use them to power my hotel so they will carry the same load day in and day out.
I’d like to wire the gen output leads into 240v single phase with an external breaker box. eliminate the single phase three phase switch and oem breaker and voltage regulator to modernize the unit. Once it’s sorted do the same for any of my other 002s that won’t carry the max load. I would wire up the voltage gage and a hertz gauge and amps.
I’d like to wire the gen output leads into 240v single phase with an external breaker box. eliminate the single phase three phase switch and oem breaker and voltage regulator to modernize the unit. Once it’s sorted do the same for any of my other 002s that won’t carry the max load. I would wire up the voltage gage and a hertz gauge and amps.