Howdy,
Here is a visual collection of 1 phase MEP generator and Essex Electro a427 load bank connections.
![1 phase MEP switch setup.jpg 1 phase MEP switch setup.jpg](https://www.steelsoldiers.com/data/attachments/404/404614-24bc568e705bd5bf2a7dfd00edf5dba6.jpg)
![1 phase lug connections.jpg 1 phase lug connections.jpg](https://www.steelsoldiers.com/data/attachments/404/404622-48d025d7293458e12fd68ff98de5b40e.jpg)
I should point out that the copper shorting link (on load bank) is placed on terminals L1 + L2 + L3, your hots are then connected to L0 + a linked stud. and ground of course
![1 phase load bank connection 1.jpg 1 phase load bank connection 1.jpg](https://www.steelsoldiers.com/data/attachments/404/404625-ae741d9e6ca25aaea2330666f722bfb3.jpg)
![1 phase load bank connection 2.jpg 1 phase load bank connection 2.jpg](https://www.steelsoldiers.com/data/attachments/404/404628-f3bebf11935155f19e9acb870d932585.jpg)
The internal connector is on the upper mount for 1 phase.
![1 phase load bank connection 3.jpg 1 phase load bank connection 3.jpg](https://www.steelsoldiers.com/data/attachments/404/404630-5d5edd33178da7f6a0d7d08f8fa91b96.jpg)
and the switch is up for high voltage select.
![1 phase load bank switch setup.jpg 1 phase load bank switch setup.jpg](https://www.steelsoldiers.com/data/attachments/404/404624-efda0bba069b8b0e82c73065ab5e987a.jpg)
Here is a visual collection of 1 phase MEP generator and Essex Electro a427 load bank connections.
![1 phase MEP switch setup.jpg 1 phase MEP switch setup.jpg](https://www.steelsoldiers.com/data/attachments/404/404614-24bc568e705bd5bf2a7dfd00edf5dba6.jpg)
![1 phase lug connections.jpg 1 phase lug connections.jpg](https://www.steelsoldiers.com/data/attachments/404/404622-48d025d7293458e12fd68ff98de5b40e.jpg)
I should point out that the copper shorting link (on load bank) is placed on terminals L1 + L2 + L3, your hots are then connected to L0 + a linked stud. and ground of course
![1 phase load bank connection 1.jpg 1 phase load bank connection 1.jpg](https://www.steelsoldiers.com/data/attachments/404/404625-ae741d9e6ca25aaea2330666f722bfb3.jpg)
![1 phase load bank connection 2.jpg 1 phase load bank connection 2.jpg](https://www.steelsoldiers.com/data/attachments/404/404628-f3bebf11935155f19e9acb870d932585.jpg)
The internal connector is on the upper mount for 1 phase.
![1 phase load bank connection 3.jpg 1 phase load bank connection 3.jpg](https://www.steelsoldiers.com/data/attachments/404/404630-5d5edd33178da7f6a0d7d08f8fa91b96.jpg)
and the switch is up for high voltage select.
![1 phase load bank switch setup.jpg 1 phase load bank switch setup.jpg](https://www.steelsoldiers.com/data/attachments/404/404624-efda0bba069b8b0e82c73065ab5e987a.jpg)
Last edited: