Howdy,
Here is a visual collection of 1 phase MEP generator and Essex Electro a427 load bank connections.
I should point out that the copper shorting link (on load bank) is placed on terminals L1 + L2 + L3, your hots are then connected to L0 + a linked stud. and ground of course
The internal connector is on the upper mount for 1 phase.
and the switch is up for high voltage select.
Here is a visual collection of 1 phase MEP generator and Essex Electro a427 load bank connections.
I should point out that the copper shorting link (on load bank) is placed on terminals L1 + L2 + L3, your hots are then connected to L0 + a linked stud. and ground of course
The internal connector is on the upper mount for 1 phase.
and the switch is up for high voltage select.