LeveeLiving504
Member
- 43
- 49
- 18
- Location
- Kenner Louisiana
So I have a 803a that I’m doing all my install work. I have worked as an electrician helper in a refinery and have a good understanding of what I need to do. I purchased Generac all in one wire 100’. I have conduit run from one building to another underground and then to my panel. I purchased a Generac ATS, 4 load shed modules, Klopp’s remote start board with relays to swing the ATS. Also have 60amp pin and sleeve connector so I can remove generator from house location since it is on 5k casters. Now here’s the problem. My Panel is a 200amp main with my meter directly to my line side of my 200a main. In order to re wire I need to pull my fancy RF meter. This will alert the power company and force me to permit the job and take me completely out the picture and require me paying and electrician. So here is the long road around this. This is where I need input please. Wire 803a to pin and sleeve and then to new wire running to panel. Back feed my panel with a 60a breaker and install interlocking device. Then when power is lost this gives me a covert time to pull my meter with no alerts and install a 200a main disconnect between my meter and my panel. I can then reinstall meter and now have a safe way to kill power with out pulling the meter. I can then at a later date shut off the line power at my new disconnect and install my ATS and load shedding modules. It’s a long road but I think this is the only way. PLEASE GIVE ME SOME INPUT.
Sent from my iPhone using Tapatalk
Sent from my iPhone using Tapatalk