• Steel Soldiers now has a few new forums, read more about it at: New Munitions Forums!

  • Microsoft MSN, Live, Hotmail, Outlook email users may not be receiving emails. We are working to resolve this issue. Please add support@steelsoldiers.com to your trusted contacts.

LME maintenance tent erection

coachgeo

Well-known member
5,174
3,500
113
Location
North of Cincy OH
anyone put a floor cloth in a tent like this before? Curious how you fix it to the ground . Would think turning would be a problem as you jocky the rig around inside. Is there like ground stakes ever 2 feet thru the material orrrrr??

PS-this image is another example as well of the whole thing tied down with ropes straint down along walls (see left corner of LME in image)

432600893_7092255647518681_137679306443620512_n.jpg
 
Last edited:

coachgeo

Well-known member
5,174
3,500
113
Location
North of Cincy OH
these end pieces are confusin gas hayl
OK.... got it... way they were folded up and stored... w/doors not in position they would be when installed .... as I unfolded and laid it out.... it just was ????? Yep it is how Platoon last folded it up.... that was causing the mind explosion :cookoo: 🤯 .. and why it made no sense.. (that's my story and Im sticking to it)

Once done blaming the Privates.. Overlapped the Garage doors; unlike how it was stored and layed out; buckled it all up on both sides, as if in full secured position for Wind storms, Snow Blizzards, rain, hail and thunder, Tanks and Taliban- (needed anyway so won't rip itself apart as you raise it up.) and then stretched it back out; that's when the corrected layout appeared, and it all made sense.
 
Last edited:
Top