Also be advised the MEP-016d is capable of 1,2,and 3 phase voltage supply. Nice feature and you can regulate voltage and hertz manually. The reconnection switch MUST be operated while the unit is not running as Isaac mentioned. My reconnection switch had the contacts welded together from switching while running ( military ) . I was able to slowly work it free. Great generators. Ran mine for 12 hours to charge the battery bank on my solar system. They are built like tanks. Got 1 hour per 1\3 gallon run time. Not bad. But they are LOUD. Went through 3 Home Depot generators before this one. The gauges are inacurate on mine though. Bought a Kill a Watt to get an accurate read out.