Not yet. It is sitting in pieces all cleaned up and waiting for me to put on the new seals and assemble it. I have a 3 day weekend coming up and hope to get it done then.
I wanted to have the airpak done before I bench bleed and install the master cylinder. Oh..and I had new front brake hoses made that are same size as the originals, so have to put those on too.
I took a little bit of a detour and replaced all of the coolant hoses and hoses that go to and from the air compressor, so I am behind where I wanted to be on the brake system. I wanted to get the coolant drained, cooling system flushed, hoses replaced and everything refilled before cold weather set in. That is done now so will get back on track.
My dad is coming out for Thanksgiving, weather permitting. I'd like to drop the oil pan and replace the rear main seal with his help. We'll see how it goes.
Let me know if there are any particular pictures you want of the airpak rebuild.