Got the wall standoffs cut and mocked up. Still need to do the rivnuts behind it, then drop my electrical outlets, and finally pull it all apart for paint. Had to use 15" centers 9opposed to the standard 16"). All three sections I had to make were 90" so it was just easier to bring the studs in to 15".
Was rained out several days this week so surprised I got any work done (my saws and stuff are all outdoor use as the garage is full of build junk).
More rain in the weekend forecast so painting may be on hold if it comes. Funny, we were 12" below normal for the year and we got 12" of rain the past week (not uncommon nor climate change BS, the tropical season is when we get it).
But I'm getting closer. I have my insulation sheets on site but not my actual wall paneling. Really wanting to get the walls done, though so I can start bolting things down. I've completely missed my build window of trying to be fishing after Labor Day weekend. I'm a month out at this rate.
View attachment 878110