- 204
- 9
- 18
- Location
- Odessa, Florida
Started my big changeover to the M915 Battery box. Had to work out exactly the right distance to offset from the frame so the step would fall under the door correctly, without having the bottom step stick too far past the body. 3.5" was the magic number. 3.5" just happens to be the short edge of the only piece of stout steel I had laying around (7/16" angle 3.5 x 5). Had to move the exhaust bracket over a little. Next is removing the current battery box (toolbox) and mounting the new MRAP air tanks, then remounting the tool box, which will finally be used for tools!
Am really happy with how solid it feels. We'll see if I still feel that way after 200lbs of battery get loaded in, then jump on that step with my 280lbs.
Am really happy with how solid it feels. We'll see if I still feel that way after 200lbs of battery get loaded in, then jump on that step with my 280lbs.