Ok, let's see Kris
1. Please measure the resistance on Rheostat R2 which is your Voltage Adujst on your Front Panel in your cubicle
This Rheostat has three terminal lugs - two of them are jumpered - please set Voltage adjust to lowest, left setting of dial and measure the resistance with the red test lead on the single connection / terminal and black lead on the jumpered connection / terminals
When done with testing please set dial in middle position
2. Please post some pictures of newly installed T2 in your A11 from some different angles
You may want to have a couple spare fuses, we may have to put 3Amp in like in the situation Brian had
After that we should be ready to go
Thanks Peter
Peter,
Is there anything we should test before I install the A11.
Kris